Dialux Simulation
Design Studio

DIALUX & PHOTOMETRIC SIMULATION

Every design decision validated by data. Lux levels, uniformity, glare — simulated before a single fixture is installed.

What We Deliver

SIMULATION-BACKED VALIDATION

Lux Level Validation

Precise maintained illuminance calculations for every zone, ensuring compliance with CIBSE, IES, and local municipality standards.

Uniformity Ratios

Emin/Emax and Emin/Eavg uniformity analysis guaranteeing consistent light distribution without hotspots or dark zones.

UGR Evaluation

Unified Glare Rating analysis at seated and standing eye heights. We target UGR < 19 for offices and < 22 for circulation.

Compliance Validation

Cross-referencing against ESTIDAMA, LEED, WELL, and Dewa-mandated energy density targets (W/m²).

Energy Calculation

Lighting Power Density (LPD) reports, annual energy consumption estimates, and ROI projections vs baseline systems.

Emergency Simulation

Emergency escape route illumination validation — minimum 1 lux on floor, 0.5 lux uniformity ratio per BS 5266.

Dialux Output Sample

Sample Outputs

WHAT YOU RECEIVE

Lux Heatmaps

Colour-coded plans showing illuminance distribution across every surface — floor, walls, workplane, and vertical surfaces.

False Colour Diagrams

Visual representation using rainbow scale (blue=low, red=high) for instant identification of over-lit and under-lit zones.

Calculation Tables

Zone-by-zone numerical summary tables with Eavg, Emin, Emax, uniformity, and UGR per calculation grid.

Isolux Diagrams

Contour lines of equal illuminance — essential for facade lighting, landscape, and sports field validation.

Daylight Integration

Combined artificial + daylight analysis using climate data. Daylight factor calculations and harvesting zone identification.

3D Rendered Scenes

Photorealistic Dialux renders showing how light interacts with materials, creating shadow patterns and highlighting textures.

Simulation Gallery

SECTOR-SPECIFIC SIMULATIONS

Each sector demands unique photometric strategies. Explore our simulation approach for different environments.

500+
Simulations / Year
99.2%
First-Pass Compliance
< 48hrs
Turnaround Time
Dialux Evo
Primary Platform

NEED A PHOTOMETRIC SIMULATION?

Send us your floor plans and lighting brief. We'll deliver a complete Dialux simulation package.

We use cookies to enhance your experience.Privacy Policy